4K HDMI Cable 2.0 Ultra HD High Speed 1m/2m/3m/5m/7m/10m/15m/20m Metre Long Lead


Price:
Sale price£9.99

Description

Data Transfer Rate
18 Gbps (HDMI 2.0 / 4K@60Hz)
Compatible Brand
Universal
SpecialFeatures
18Gbps, 4K@60Hz, HDR, ARC, Dolby/DTS pass-through, HDCP 2.2, 3D
Compatible Devices
TV/Projector/Monitor, PS5, Xbox, AV Receiver/Soundbar, PC/Laptop
Connect to
Any HDMI Device (TV/Monitor/Projector/Console/Soundbar)
Connection Split/Duplication
1:1
Compatible Model
Universal
Gauge
28 AWG
Colour
Black
Brand
True HQ
Type
HDMI Cable
Manufacturer Warranty
3 Years
Connector B
HDMI 2.0, HDMI Standard Male
Connector A
HDMI 2.0, Hdmi Male To Male, HDMI Standard Male
Cable Length
1m 2m 3m 5m 7m 10m 15m 20m 25m 30m
Features
Gold Plated, Round Cable, Premium Build, Short HDMI Cable, Long HDMI Cable
Resolutions Supported
2160p@60Hz, 1440p@144Hz, 1080p@240Hz
Country/Region of Manufacture
China
Output Voltage
5 V
Country of Origin
China
True HQ
4K HDMI Cable (1m–30m) • HDMI 2.0 High Speed
HDR • ARC • Gold Plated • Premium Build • 3 Year Warranty
QUICK SPECS
🏅 Premium Build Quality
📺 4K@60Hz (up to)
⚡ 18Gbps
🔌 HDMI 2.0
🔊 ARC
✨ HDR
✨ Gold Plated
🛡️ 3 Year Warranty
📏 1m–30m
Premium build quality for reliable performance — perfect for tidy short setups and long-run installations.
✅ Brand new & sealed
🎮 PS5 / Xbox Ready
🚚 Same-day dispatch (before 11am)
🔁 30-day returns
Buy with confidence
Reviewed & recommended by HDTVTest (YouTube) and awarded Best HDMI Cable by Tech Advisor. We focus on dependable performance and responsive UK customer support.
ITEM DESCRIPTION

Upgrade your setup with the True HQ 4K HDMI Cable — a premium HDMI 2.0 lead built for a stable signal and reliable performance (brand new in original packaging).

1m–5m short lengths: Perfect for tidy TV units and desk setups — less clutter and a clean finish behind your TV/console/PC.

7m–30m long lengths: Ideal for wall-mounted TVs, projectors and bigger-room extra long installs (home cinema, gaming, office).

Works with all standard HDMI Type-A devices and is backwards compatible with HDMI 1.4 / 1.3 (performance matches your device).

WHY TRUE HQ?
🏆 Trusted Reviews
Recognised by leading reviewers — built to perform in real-world home cinema and gaming setups.
✨ Premium Finish
Gold plated connectors and durable construction for dependable everyday use.
🛡️ 3 Year Warranty
Backed by a 3 year warranty and responsive UK customer support.
FEATURES & SPECS
Key Performance
HDMI Standard HDMI 2.0
Bandwidth 18Gbps
Resolution Up to 4K@60Hz • 1440p@144Hz • 1080p@240Hz (on compatible devices)
HDR Supported (device dependent)
ARC Supported (device dependent)
Build & Compatibility
Connectors HDMI Type-A Male to Male
Connector Finish Gold Plated
Ethernet Supported (compatible devices required)
Lengths 1m–30m (select your length from the dropdown)
Warranty 3 Year Warranty
What’s Included 1× True HQ HDMI Cable (selected length)
Brand True HQ
Long-length note: For best results, avoid tight bends and running alongside mains power leads. For 25m/30m, a powered HDMI booster may be required on some setups. Need help? Message us.
IDEAL USES
🏠 Home Cinema
TVs, projectors, AV receivers and soundbars. Ideal for wall-mounted TVs and ceiling projectors.
🎮 Gaming
PS5 / PS4, Xbox Series X|S / Xbox One and Nintendo Switch.
📺 TV & Streaming
Sky/Virgin, Fire TV Stick, Apple TV, Roku, Blu-ray players and media devices.
📹 CCTV & Security
Connect DVR/NVR systems to monitors or TVs for clear viewing in homes, shops and warehouses.
🖥️ PC & Monitor Setups
Perfect for desktops and laptops to monitors/TVs — ideal for 1m–5m desk setups, streaming and work-from-home.
🏢 Offices & Presentations
Boardrooms and meeting rooms — connect laptops/PCs to TVs and projectors with confidence.
⛪ Churches, Venues & Outdoor Events
Ideal for halls and venues, plus extra long HDMI cable runs to a garden TV/projector for sport, BBQs and movie nights.
SHIPPING & RETURNS
🚚 Shipping
  • 1 Working Day dispatch on all orders
  • Royal Mail delivery typically 2–3 working days
  • Next Day option available at checkout (additional fee)
🔁 Returns
  • 30-Day Return Guarantee
  • Return for a full refund within 30 days if you’re not happy
  • Buyer pays return postage unless the item is faulty
  • Faulty item? Message us — we’ll sort it quickly
Need help choosing a length? Send us your device setup + distance and we’ll recommend the best option.

You may also like

Recently viewed